Project Overhead Table Formats (ProjectOverhead)
Follow Deltek specifications for preparing a file containing project overhead data.
| Field Name | Data Type | Length | Notes |
|---|---|---|---|
| WBS1 | varchar | ||
| WBS2 | varchar | ||
| WBS3 | varchar | ||
| Period | integer | Optional. Enter an accounting period here if you want to enter separate overhead amounts for different periods. Leave this field blank if you want to enter a single
job-to-date overhead amount for the
project or the
project/task.
The format for this field is YYYYPP, where YYYY is the 4-digit year and PP is the 2 digit period. |
|
| Amount | decimal | Required. The amount of overhead accumulated by the project or project/task. If the project or project/task has already accumulated overhead, either through the Overhead Allocation utility or through History Loading, Deltek adds the overhead amount entered here to the amount that already exists. | |
| AmountProjectCurrency | decimal | 9 | Multicurrency feature only. |
