Field | Description |
Search
|
By default, the dialog box displays all resources, but you can use either or both of the two
Search fields to restrict the list:
When you select a search in the top
Search field,
employees are listed first, followed by generic resources, if the search results include both types of resources. However, if you use the bottom
Search field, the results are sorted alphabetically by name, so
employees and generic resources are likely to be intermingled.
|
Resource
|
This grid column displays a list of the resources based on your entries in the two
Search fields.
Select the check boxes next to the resources that you want to assign to the
project. The number selected displays below the grid.
Click the name to display a tooltip containing additional
employee or generic resource information. For an
employee, you can view job title,
organization, labor category, utilization target percentage, hours per day, status, and email address. For generic resources, you can view
organization, labor category, and status.
|
Scheduled %
|
For each
employee, this grid column displays the percentage of available hours in the plan date range that are currently scheduled for the selected
project or for any other
project. The plan date range used in this calculation is the date range for the highest-level WBS element displayed in the WBS grid.
Scheduled % = (Employee's total scheduled hours in plan date range / (Employee's hours per day x Total work days in plan date range)) x 100
This column is blank for generic resources.
|
Clear Selections
|
If you select some resources and then decide you want to clear all of those selections and start over, click
Clear Selections.
If no resources are selected, this option does not display.
|
Hard Book
|
If you consider the new assignments hard booked, select this check box.
This check box is only available if
DPS is configured to use soft and hard booking and if you have the required security access to hard book assignments.
|
Select and Level
|
This grid displays the WBS hierarchy in
Level, along with any existing resource assignments. If you opened the Assign Resources to
Project dialog box from the top-level
project row in the
Project View grid, the entire WBS hierarchy for that
project is available in this grid. If you opened the dialog box from a lower-level WBS element, only that element and the part of the hierarchy under that element are available. Expand the hierarchy to display the WBS elements to which you want to assign the selected resources, and click
+ in
Select next to each of those elements.
These new assignments are only pending assignments at this point. The actual assignments and update of the plan occur when you click the
Assign button at the bottom of the dialog box. The number of pending assignments displays next to the
Assign button.
You can only assign resources to the lowest-level WBS elements in each branch of the WBS. A
+ displays only next to those elements. You can also expand lowest-level elements to display any resources that are already assigned to them.
|
|
If you add an assignment and then want to remove that assignment, hover over the resource row in the WBS grid and click
at the end of the row.
This option is only available for pending resource assignments. To delete an assignment that was added to the plan previously, use the deletion option in either the
Project View grid or the Resource View grid.
|
Assign
|
Click this button to confirm the assignments, close the dialog box, and update the plan information in the
Project View grid.
|