Use the Contract tab on the 
	 Projects form (Plan mode) to view a detailed analysis of the contract information related to the current 
	 project. This includes calculations, specific breakdowns of billing amounts, and other plan details down to the designated work breakdown structure (WBS) level. 
  
 
	  
		If the Accounting module is activated, the amounts on this tab come from or are calculated from the amounts entered on the Budget & Revenue tab in the 
		  Projects hub in the desktop application. You cannot make any changes to the fee amounts on this tab; you must make them on the Budget & Revenue tab. 
		
 
		If the Resource Planning module is activated but the Accounting module is not activated, you can enter contract fee amounts on this tab for labor, direct expenses (or indirect expenses for a promotional or overhead 
		  project), reimbursable expenses, direct 
		  consultants, and reimbursable 
		  consultants. 
		  DPS then calculates other fee amounts based on your entries. You enter the amounts at the lowest level of each branch of the plan structure, and 
		  DPS rolls up those amounts to the higher levels. If the Cost and Billing budget type is selected and the 
		  project uses different 
		  project (cost) and billing currencies and 
		  Use Billing Currency not 
			 Project Currency is selected on the Accounting System Settings form in the desktop application, you can enter both cost and billing contract fee amounts. 
		   
		
 
		The amounts on this tab display at billing or cost, depending on the option you select in the upper-right corner of the form. Whether both options are available depends on the budget type selected for the project plan. If both 
		  Billing and 
		  Cost options are available, you can switch between them, and the tab's information will update accordingly. 
		
 
		If your firm uses multiple currencies, the currency in use is indicated next to the 
		  Billing or 
		  Cost option. The project cost currency is always used when viewing projects and plans at cost. A configuration setting that your system administrator selects determines whether project cost currency or billing currency is used when you view projects and plans at billing. 
		
 
		When you select the 
		  Cost option, some information may not display if your security role does not provide access rights to labor cost rates and amounts. 
		
 
	  
 
	 Contents
 
		 
		The columns described below are the columns that are potentially available to display in the grid. Click 
		   next to the upper-right corner of the grid to add or remove columns. When setting up 
		  DPS, your system administrator may decide that some columns will not be used. Those columns will not be available for selection.
 next to the upper-right corner of the grid to add or remove columns. When setting up 
		  DPS, your system administrator may decide that some columns will not be used. Those columns will not be available for selection. 
		
 
		| Field | Description | 
|---|
 
		   
			 | Level | This column displays the elements in the plan structure. In either case, you can expand or collapse the levels of the structure. By default, only names display for WBS elements, but you can display WBS numbers along with the names. Click 
				   next to the upper-right corner of the grid, and select the 
				  Show 
					 Project Numbers check box in the Column Settings & Selections dialog box. Click the arrow next to an element of the structure to drill down to the elements on the next lower level. 
				 | 
 
		   
			 | Compensation | This column displays the 
				compensation amount: Labor + (Direct expenses or Indirect expenses). | 
 
		   
			 | Direct 
				Consultants | This column displays the direct 
				consultants fee for each WBS element. The sum of the amounts in this column and the amounts in the 
				  Reimbursable 
					 Consultants column displays in the 
				  Contract column on the 
				  Consultants tab. 
				 | 
 
		   
			 | Direct Expenses or Indirect Expenses | For 
				projects with the Regular charge type, this column displays the direct expenses fee for each WBS element. For 
				projects with the Promotional or Overhead charge type, this column displays the indirect expenses fee for each WBS element. The column heading displayed is based on the 
				project charge type. An indicator displays to alert you when 
				  compensation exceeds direct expenses. 
				 The sum of the amounts in this column and the amounts in the 
				  Reimbursable Expenses column displays in the 
				  Contract column on the Expenses tab. 
				 | 
 
		   
			 | Labor | This column displays the direct labor fee for each WBS element. The amounts in this column also display in the 
				  Contract column on the Labor tab. 
				 | 
 
		   
			 | Notes | Click  in this column to enter or display plan notes related to the WBS element. Be aware that a note is attached to the WBS element, not to the plan. If you save the baseline, the current version of the note is not saved as part of the baseline. If you publish the plan, the current version of the note is not part of the published plan. If you revert plan changes, changes you made to a note are not reverted. 
				   
				 The plan notes are also displayed in an info bubble, along with other information for a WBS element, when you click on the WBS element in any of the planning grids in the 
				  Projects hub or in Resource Management. 
				 | 
 
		   
			 | % of Total Contract | This column displays each WBS element's percentage of the total contract for the 
				project: Total contract amount for the WBS element / Total contract amount for the 
				project x 100. This column is only available if 
				  At Lowest Level Only is selected in 
				  Project Fee Entering Method on the Accounting System Settings form in the Desktop application (). 
				 | 
 
		   
			 | Reimbursable Allowance | This column displays the reimbursable allowance amount for each WBS element, which is all expenses that will be reimbursed to your company by the 
				  client: Reimbursable expenses + Reimbursable 
				  consultants. 
				 | 
 
		   
			 | Reimbursable 
				Consultants | This column displays the reimbursable 
				  consultants fee for each WBS element. 
				 The sum of the amounts in this column plus the amounts in the 
				  Direct 
					 Consultants column displays in the 
				  Contract column on the 
				  Consultants tab. 
				 | 
 
		   
			 | Reimbursable Expenses |  This column displays the reimbursable expenses fee for each WBS element. 
				 The sum of the amounts in this column plus the amounts in the 
				  Direct Expenses or 
				  Indirect Expenses column displays in the 
				  Contract column on the Expenses tab. 
				 | 
 
		   
			 | Total Contract | This column displays the total contract amount for each WBS element: Labor + Direct or indirect expenses + Direct 
				  consultants + Reimbursable expenses + Reimbursable 
				  consultants. 
				 | 
 
		   
			 |   | Click this icon next to the upper-right corner of the grid to display the Column Settings & Selections dialog box and do either of the following:  
				  Display WBS numbers along with names in the grid 
				  Add or remove grid columns 
				   | 
 
		   
			 |   | To display the Contract Calculations chart and the Contract Breakdown chart for a WBS element, hover over or click the WBS row and click this icon at the end of the row. The charts display in the Contract Charts dialog box. If you leave the dialog box open, you can select other rows in the grid, and the charts update automatically to reflect the currently selected row. The charts also update automatically if you change data in the grid that affects the currently selected row. 
				 |