Convert Task Number Formats

Use the Key Format utility to reformat the length, delimiter, or delimiter position for your task numbers.

When you install DPS, the default work breakdown structure (WBS) has only the project level (WBS 1 level). If you also want the option to use the task level (WBS 3 level), use this utility to specify the task number length and other format information.

If you activate the task level and later decide that you want to deactivate it system-wide, contact Deltek Customer Care for guidance. The process for removing a WBS level can be complicated and labor intensive.

Prerequisite: Back up your DPS database.

To reformat task numbers:

  1. On the Navigation menu, click Utilities > Key Formats > Tasks.
  2. Complete the fields on the Task Number Format form.
  3. Review the Sample Value field to see the format as it will be after the key conversion is run.
  4. Click Run.