Overhead Allocation General Tab

Use the General tab to select report options for the Overhead Allocation report and to save sets of options for reuse.

Contents

Field Description
Report Name You can change the default report name.

Option

Field Description
Show Each Project Select this check box if you want the report to show detail for the projects to which overhead was allocated, in addition to a total line at the end of the report. Clear this check box if you only want to see the total line.