How Vision Determines Which Billing Terms to Use

Vision uses the billing terms established at the most granular WBS level that exists for the project. If you have not entered terms for that level, or if you have chosen to consolidate printing at a higher level, Vision uses the terms entered for the next higher level, or the level to which the terms were consolidated.

When a project is opened in the Billing Terms form, and the project is sub-divided into lower levels of the WBS, you can open a Sub-Level Terms tab to enter billing terms for the lower levels.