Time and Materials Contracts with Upset Limits

If a project is based on a time and materials contract that has upset limits, it uses either a multiplier or a rate table with a maximum.

You can use the same revenue methods that you use for projects based on a time and materials contract without upset limits:

As an alternative, you can use one of these procedures to calculate accrued revenue: