Assign a Rolling Wave Calendar to the Project

Use the Project Properties dialog box to assign a rolling wave calendar to the project.

To assign rolling wave calendar to a project:

  1. Display the Project Properties dialog box and click the Files tab.

  2. In the Rolling Wave group box, select the rolling wave calendar in the Calendar field.

  3. Click Apply and then click OK.