Criteria Page of the Replan Wizard
Use this page to select which project code you want to replan.
Contents
| Field | Description |
|---|---|
| Criteria | Use this field to select one of the following options:
If the code you selected has a hierarchical structure, the Replan process includes that code and its children if the Include all children option is selected. |
| Selection | This field is available only if you selected a criterion other than Total Project in the Criteria field. Click |
| Include all children | This option is available if you select a code with children in the Selection field. Selecting this option instructs Cobra to run the process against the parent code and its children. For example, if you selected WBS code 1 in the Selection field and this has child codes 1.1 and 1.2, then Cobra will run the process against codes 1, 1.1, and 1.2. This option is enabled only for code criteria that are hierarchical in nature, such as WBS and OBS. |
How to...
Select the Earned Value Method
Select the Level at Which to Capture Actual Costs
Learn more about...